Markets

US 1 and Pineda Causeway Intersection Improvements

Project Overview

Project Summary

KPM Franklin has been contracted by the Florida Department of Transportation (FDOT) District 5 to provide civil engineering services for intersection improvements to improve safety and overall operations at the eastbound U.S. Highway 1 (U.S. 1) and Pineda Causeway (SR 404) off ramp intersection in Brevard County, Florida. The existing southbound U.S. 1 to eastbound Pineda Causeway ramp will be modified to provide a dedicated auxiliary lane onto southbound U.S. 1 through the intersection of the eastbound Pineda Causeway off ramp with U.S. 1. A new signal will be constructed at the intersection of the eastbound Pineda Causeway off ramp at U.S. 1 to improve safety for motorists utilizing the eastbound Pineda Causeway off ramp that want to make a left turn on U.S. 1 heading northbound.

Scope of work included roadway analysis and plans, stormwater drainage plans, signing and pavement markings analysis and plans, signalization plans and 3D modeling.

Interested in joining us? KPM Franklin is always looking for qualified talent.