Insights

Partin Settlement Road Widening and Reconstruction

KPM Franklin is proud to be on a team providing professional engineering and surveying services to develop construction plans for widening 2.7 miles of Partin Settlement Road in Osceola County. KPM Franklin will provide drainage design and survey support for the proposed four-lane divided roadway project. KPM Franklin is on a team led by Johnson, Mirmiran & Thompson, Inc., a planning, design and construction phase consulting services company with offices in 13 states.

Recent Posts

Falcon Trace II Right Turn Lane

The Offsite improvements at the Falcon Trace II multi-family residential project in Kissimmee Fla. are complete with the addition of two left turn lanes on

Aquatic Vegetation Filters Stormwater Runoff

Aquatic vegetation is beginning to sprout in a redesigned and expanded stormwater retention pond at the Hillpointe Pointe Grand Davenport multi-family residential project in Polk

Interested in joining us? KPM Franklin is always looking for qualified talent.